Yes, that is correct. In this instance, all three sites must be created, and the corresponding product(s) for each site must be created and appropriately assigned to their respective locations.
During the preparation of the Certification Scope work order, all products have to be added to the certification scope.
Please note that, depending on whether the Option 1 multisite producer is operating a QMS or not, the applicable certification option shall be selected (Option 1 multisite with or without QMS).